Updates on several fronts this week. First, a look at the shower curb underway:
Notice the base row of white wall tiles to the right of the shower.
Base row of tiles: done. Now the subway tile starts up the wall:
Tile work had to stop so that the window on the north wall could be removed . . .
. . . and replaced with a new double-hung window:
Both windows were trimmed to match the two double-hung windows on the other side of the bathroom.
With the new window in, the tile work could continue:
On the other side of the bathroom, the pocket door was framed:
As you can see, we were able to use the original five-panel door. (It will be painted white.)
We were also able to use the original trim on the other side of the door. Here it is back in place:
That door you see on the right goes to the linen closet.
I’ll have a lot more to show you next week so please stop by!
It’s all beautiful! Love the original door and trims. Thanks for sharing.
It’s looking great!