Bathroom Reno, Week 6


Updates on several fronts this week. First, a look at the shower curb underway:

A pattern of green and yellow colors with white background
Notice the base row of white wall tiles to the right of the shower.

Base row of tiles: done. Now the subway tile starts up the wall:

A pattern of green and yellow colors with white background
Tile work had to stop so that the window on the north wall could be removed . . .

A pattern of green and yellow colors with white background

. . . and replaced with a new double-hung window:

A pattern of green and yellow colors with white background

Both windows were trimmed to match the two double-hung windows on the other side of the bathroom.

With the new window in, the tile work could continue:

A pattern of green and yellow colors with white background

A pattern of green and yellow colors with white background
On the other side of the bathroom, the pocket door was framed:

A pattern of green and yellow colors with white background

As you can see, we were able to use the original five-panel door. (It will be painted white.)

We were also able to use the original trim on the other side of the door. Here it is back in place:

A pattern of green and yellow colors with white background
That door you see on the right goes to the linen closet.

I’ll have a lot more to show you next week so please stop by!

 

 

 

This entry was posted in bathroom remodel, update. Bookmark the permalink.

2 Responses to Bathroom Reno, Week 6

  1. Lisa Kus says:

    It’s all beautiful! Love the original door and trims. Thanks for sharing.

  2. AnnMarie says:

    It’s looking great!

Comments are closed.