Kitchen Remodel — Week 8
How I wish I could report the kitchen remodel is done. But no, we had a setback. On Monday morning of Week 8, my contractor inspected the crown molding that had been installed on the refrigerator wall the previous Friday and insisted that it be redone. (Is that not a sign of a good contractor?) Because of scheduling issues, the redo didn’t happen till the end of the week. That meant that the painting of the trim and the touch up on the walls and ceiling had to be pushed forward to Week 9.
In addition, we are waiting for delivery of a hood liner for the range hood insert. When I ordered the insert there was no mention of a hood liner. How vexing is that? We didn’t discover a liner was necessary until the insert was actually being installed. Result: the part didn’t get ordered till the end of May. I was hoping it would be here by now.
At least my husband and I are back in the kitchen making meals, getting accustomed to the new appliances, and admiring the new look. My twin sister Diane surprised us with a Cuisinart “Coffee on Demand” coffeemaker:
(Thanks, Nubs — we love it!) And how do you like my new ceramic canisters? I found them online and ordered them because they looked to be the same color as the lower cabinets. It’s a pretty good match!
Here’s a look at the west wall (sans crown molding):
I am loving the gleam of the stainless steel appliances and polished nickel bin pulls and the crisp contrast of the blue and white cabinets.
My sewing/quilting life may have been put on the back burner (so to speak) during this remodel but I am gearing up for more appliqué on Hazel’s Diary Quilt. I’m auditioning fabrics for the corner flowers on the center medallion and have cut out a few petals and leaves:
That’s a start. As a reminder, here’s a look at the center medallion from the cover of Shelly Pagliai’s book which contains the directions for Hazel’s Diary Quilt and several other quilts and small projects:
(You may remember I picked a different block for the center of my quilt.)
I’ve prepared the bias stems that wind around the light grey strips surrounding the block in the middle of the medallion and have cut out a few leaf shapes:
Progress on this project has been admittedly slow but I have given myself a deadline of July 31 to complete the top. That’s the day I’ve arranged to turn it over to an accomplished longarm quilter for custom quilting. Nothing like a deadline to get one going!